35 court petitions against DOE's 202(c) power plant orders: one decided, 21 in abeyance
说明与用途
作者汇总了35份关于DOE 202(c)命令的法庭请愿,显示1份已决定、21份待处理、3份正在审理,使用RECAP和Python完成。
问题
The U.S. Department of Energy keeps eight power plants running past their planned retirement or run limits using 34 orders under section 202(c) of the Federal Power Act, creating a complex set of court petitions that need to be tracked and analyzed.
结果
The author produced a CSV table summarizing 35 petitions for DOE 202(c) orders, showing 1 decided, 21 abeyance, and 3 briefed in the Ninth Circuit, with links to each docket.
工作流
- 1. Query CourtListener RECAP archive for all petitions related to DOE 202(c) orders.
- 2. Extract petition metadata: docket number, circuit, plant name, filing date, status, and links.
- 3. Classify each petition as decided, abeyance, or briefed based on court records.
- 4. Count petitions per plant, per circuit, and per status category.
- 5. Export the compiled data to a CSV file.
- 6. Verify counts against the source data using unit tests in the Python script.
- 7. Publish the CSV and script on GitHub for transparency.
证据
I looked up every such petition in CourtListener's RECAP archive and put them in one table.
35 petitions for review: 32 in the D.C. Circuit and 3 in the Ninth Circuit (Centralia, WA).
One order has been decided. The D.C. Circuit ruled on Campbell's first order (MI) on 11 September 2026, 414 days after the first petition and 386 days after the order had expired.
21 petitions are held in abeyance… At least 10 of them wait, by the orders' own words, on the Campbell decision or its mandate.
Only Centralia's three petitions are being briefed in the Ninth Circuit.
The code is standard-library Python, and its tests check each count against the CSV.
- 记录日期: 2026-10-19T13:41:22.917Z