We migrated from AWS to GCP with minimal downtime
说明与用途
PostgresML成功将数据库从AWS迁移到GCP,迁移过程中停机时间极少。
问题
Migrate a PostgreSQL database from AWS to GCP with minimal downtime.
结果
The database was migrated from AWS to GCP with minimal downtime, moving the entire database workload to GCP while maintaining availability.
工作流
- Set up a new GCP project and provision the required compute and storage resources.
- Configure the target GCP PostgreSQL instance to match the source AWS database configuration.
- Establish replication between the AWS source and the GCP target to keep data in sync during the cutover.
- Validate data consistency between source and target environments.
- Cut over traffic to the GCP instance, completing the migration with minimal downtime.
证据
We migrated from AWS to GCP with minimal downtime.
We migrated from AWS to GCP with minimal downtime
- 记录日期: 2026-11-02T10:44:09.999Z