We migrated from AWS to GCP with minimal downtime
说明与用途
将 PostgreSQL 和 ML 工作负载从 AWS 迁移到 GCP,停机时间最小化。
问题
The team needed to move their PostgreSQL and ML workloads from AWS to GCP while keeping downtime to a minimum.
结果
The migration completed with less than 30 minutes of downtime, improved scalability, and reduced operational overhead.
工作流
- 1. Set up a GCP project and enable Cloud SQL and Compute Engine APIs.
- 2. Create a Cloud SQL instance with PostgreSQL and install pgvector and PostgreSQL ML extensions.
- 3. Export the AWS database using pg_dump and import into Cloud SQL.
- 4. Configure network connectivity and firewall rules between AWS and GCP.
- 5. Update application connection strings to point to the new Cloud SQL instance.
- 6. Perform a test migration and validate data integrity and application functionality.
- 7. Switch traffic to GCP during a low-usage window, monitoring performance and logs.
- 8. Decommission AWS resources after successful cutover.
证据
We migrated from AWS to GCP with minimal downtime
- 记录日期: 2026-09-15T11:15:34.981Z